Three Distribution Centres in Kingston Park South , Peterborough

Three Distribution Centres in Kingston Park South , Peterborough

Three Distribution Centres in Kingston Park South , Peterborough

Client
Firethorn Trust
Market Sector
Distribution, Design And Build
Type
Medium Span Portal Frame
Steel
1700 te
Engineer
JPP Consultancy
Contractor
Glencar Construction
Architect
UMC Architcts

Project Details

Client
Firethorn Trust
Market Sector
Distribution, Design And Build
Type
Medium Span Portal Frame
Steel
1700 te
Engineer
JPP Consultancy
Contractor
Glencar Construction
Architect
UMC Architcts

Structural steelwork is the favoured framing solution for distribution centre construction, with a market share that exceeds 90%. Steel offers a number of benefits, such as speed of construction and the ability to efficiently create long internal spans, which are so important for warehousing facilities.

Caunton Engineering’s experience with design and build is shown with this project at Kingston Park, Peterborough, where it has designed, fabricated, supplied and erected three distribution centres on behalf of Glencar Construction. The advantages of design and build include the fact that a steelwork contractor with experience of such structures can quickly and efficiently streamline a distribution centre’s steel frame.

All three of the buildings are portal frames and have a similar design and concept, albeit they are all different sizes. The largest building on the site, known as Building 300, was also the first structure to be erected. This portal frame consists of four 31m-wide spans and is 168m long.

Related Market Sector Projects

Our Affiliates