Market Sector(s): Industrial, Rail, Design And Build, Secondary Steelwork
Caunton Engineering have supplied 2400 tonnes of structural steelwork for two major precast plants to be used in the building of HS2. These are the precast plant required to produce wall lining sections for the 10-mile long Chiltern tunnels, and a second steel framed precast plant to be used to cast sections for the nearby Colne Valley Viaduct. The project in total comprises fifteen buildings, and...

Market Sector(s): Rail, Design And Build, Infrastructure
Caunton have benefitted from a rail improvement project which costed around £146.6 million and lead to the improvement of the Cornish rail network, as well as a significant ‘Night Riviera’ sleeper service upgrade. The company has supplied the steelwork for a new maintenance shed at Long Rock Train Maintenance Depot half a mile east of Penzance railway station.

Market Sector(s): Rail, Infrastructure
Caunton have supplied the structural steelwork for a new maintenance depot, wheel lathe and carriage wash buildings at the Doncaster Carr site in Doncaster. Over a thousand tonnes of framing steelwork have been erected for main contractor Volker Fitzpatrick, whose client is Hitachi Rail Europe. The site is to be a maintenance depot for trains procured under the Intercity Express Programme. Work st...

Market Sector(s): Rail, Design And Build, Infrastructure
Caunton are supplying and erecting the steelwork frame for a new train maintenance depot in Crawley, Sussex. They are working for main contractor Volker Fitzpatrick. The project is part of the Thameslink programme which will see capacity increased on north-south routes through central London between Bedford and Brighton, and routes to Peterborough and Cambridge via Finsbury Park.

Market Sector(s): Rail, Infrastructure
Caunton supplied and erected the steelwork frame for a new train maintenance depot in Hornsey, north London for main contractor Volker Fitzpatrick. The project is part of the Thameslink programme which will see capacity increased on north-south routes through central London between Bedford and Brighton, and routes to Peterborough and Cambridge via Finsbury Park.

Market Sector(s): Rail, Infrastructure
Caunton have been awarded the steelwork package by Volker Fitzpatrick for their £36m Reading train care depot implementation works contract for Network Rail. This contract has been drawn up as part of the £850m Reading area redevelopment which will include a new east chord to be built through the existing Reading train care depot, meaning the depot needs to be relocated. The existing depot will be...

1 2 
Our Affiliates