Secondary Steelwork: 1 to 6 of 26 matches

Market Sector(s): Industrial, Secondary Steelwork
Caunton Engineering designed the steel frame, and associated secondary steelwork consisting of chequer plate flooring and handrailing, for a new £140M extension to the Etex Plasterboard Manufacturing Facility in Bristol, as part of an expansion to double their capacity and provide additional employment to the local area.

The entire 43000m2 development, which is 525m long in total, consists of a...

Market Sector(s): Distribution, Design And Build, Secondary Steelwork, Sustainable
Caunton Engineering's steelwork is for garden and leisure retailer, The Range, and their new distribution warehouse at Gateway 14, Stowmarket. For this contract, speed was of the essence, with Caunton having supplied and erected the main and secondary steelwork in just nine weeks for the 111,000 metre squared warehouse. With sustainability at the heart of this project, a large percentage of the s...

Market Sector(s): Distribution, Design And Build, Secondary Steelwork
Caunton supplied the main and secondary structural steelwork for what the press describes as a huge distribution warehouse for retailer T J Morris near Warrington. The £118million project was undertaken by main contractor Bowmer and Kirkland. Caunton fabricated, supplied and erected 6,000te of steelwork.

Market Sector(s): Distribution, Design And Build, Secondary Steelwork, Sustainable
Caunton Engineering were pleased to of supplied the main and secondary structural steelwork for three new logistics centres at the Omega site near Warrington for major main contractor McLaren Construction. Omega is a property development site in Warrington , comprising 226 hectares straddling the M62 motorway. The site comprises a large part of the former RAF Burtonwood airbase. This latest devel...

Market Sector(s): Energy, Secondary Steelwork, Sustainable
Caunton Engineering were delighted to have been entrusted with the order of the steelwork for a biomass-fired Energy Plant at Cramlington, Northumberland. This was the fourth order for Caunton for power plants constructed by Burmeister & Wain Scandinavian Contractor (BWSC). Caunton have already supplied the steelwork for over 900te of structural steelwork for this biomass plant. Low grade wood, th...

Market Sector(s): Distribution, Design And Build, Secondary Steelwork
Caunton Engineering were most pleased to have been awarded the contract by main contractor Readie Construction for the structural main and secondary steelwork for a major warehouse structure in Burton. The building is located on the St Modwen Park in Burton, which is a 50-acre industrial & distribution site with outline planning consent for up to 1m sq. ft. This is a prominent site providing direc...

1 2 3 4 5 
Our Affiliates