Market Sector(s): Industrial, Rail, Design And Build, Secondary Steelwork
Caunton Engineering have supplied 2400 tonnes of structural steelwork for two major precast plants to be used in the building of HS2. These are the precast plant required to produce wall lining sections for the 10-mile long Chiltern tunnels, and a second steel framed precast plant to be used to cast sections for the nearby Colne Valley Viaduct. The project in total comprises fifteen buildings, and...